In February Reliance successfully completed 3 projects for our major client in Harpenden, Herts, the works consisted of demolished 2 4bedbroom houses and 1 7 bedroom house in a period of 3 weeks. Asbestos surveys were carried out on all properties and all resulting asbestos materials were removed and disposed of before demolishing works commenced.

A gang of 6 demolition operatives were then instructed to carry out a soft strip out and demolition on each property, 3 of our 20 tonne 360 Volvo excavators with various attachments were sent to each site to carry out the demolition process, each house was demolished down inside 2 days with the resulting timber, scrap iron and metal and hard core materials being disposed of in various bins to be recycled for future use.

All works were completed on time with minimum disruption and annoyance to surrounding neighbours with all the sites being left in a clean and tidy condition ready to be handed back to the client.